LEFT | RIGHT |
(no file at all) | |
| 1 Production Model |
| 2 ################ |
| 3 |
| 4 The production module defines basics for production management: Bill of |
| 5 material and production order. |
| 6 |
| 7 |
| 8 Bill of Material |
| 9 **************** |
| 10 |
| 11 Bills of Material are list of products and quantities needed to produce a |
| 12 product. It is often shorten with BOM. |
| 13 |
| 14 Production |
| 15 ********** |
| 16 |
| 17 A Production is mainly defined by a product, a BOM, a location, a quantity and |
| 18 two lists of moves: |
| 19 |
| 20 * Inputs |
| 21 |
| 22 The moves between the storage location and the production location (as |
| 23 defined on the warehouse) for products used for production. |
| 24 |
| 25 * Outputs |
| 26 |
| 27 The moves between the production location and the storage location for |
| 28 products produced. |
| 29 |
| 30 The production can be in one of this states: |
| 31 |
| 32 * Request |
| 33 |
| 34 The production is requested by the system. |
| 35 |
| 36 * Draft |
| 37 |
| 38 Input and output moves are in draft. |
| 39 |
| 40 * Waiting |
| 41 |
| 42 The production is waiting for action and all moves are still in draft. |
| 43 |
| 44 * Assigned |
| 45 |
| 46 The input moves are assigned. |
| 47 |
| 48 * Running |
| 49 |
| 50 The input moves are in state done. |
| 51 |
| 52 * Done |
| 53 |
| 54 The output moves are in state done. |
| 55 |
| 56 * Cancel |
| 57 |
| 58 All moves are cancelled. |
| 59 |
| 60 The cost of the production is computed with the sum of the cost price of all |
| 61 incoming products. If a product is selected, it will have the cost as unit |
| 62 price. The production verify that all the cost is spread on the unit price of |
| 63 output moves. |
LEFT | RIGHT |